Fuzzy Filters
North Star BlueScope - Delta, OH
Our General Construction group erected a 5,000 SF pre-engineered metal building, interior office build-out, and slab-on-grade foundations where the fuzzy filters would later be set.
Our Virtual Design in Construction (VDC) department laser scanned the building, our fabrication shop fabricated the pipe and then our pipefitters set the pumps, tanks, & six fuzzy filters.
The pictures below show the accuracy of our VDC department’s 3D laser scanning.
- 5 months duration
- $2 million project value