Central Chiller Plant 2 & Infrastructure Upgrade
BGSU - Bowling Green, Ohio
IPS was contracted to do interior demolition and structural modifications so 2 large chillers could be installed. The new chillers are to supply central chilled water for 5 buildings on the southwest portion of the BGSU campus.
The project included removal and replacement of existing chilled water systems in each building and installation of an underground infrastructure to connect the buildings to the main central chiller supply.
A large portion of the project was performed over a 2 month period to limit disruption on the campus while students and staff were present.
- 50,000 SF Facility size
- Bid Build delivery method
- 12 months duration
- $11.4 million project value