Project Gallery All ProjectsAlternative Energy & PowerAutomotiveCommercial & InstitutionalFood/Beverage & PackagingGlass & AggregatesHealthcareIndustrial MetalManufacturingPetrochemical Amcor40,000 SF addition to the pet food packaging facility The AndersonsFertilizer packaging process upgrades Apex/Montauk EnergyRNG (renewable natural gas) landfill facility Asama8,432 SF cold storage warehouse AutoneumEquipment and infrastructure installation BerQ RNGSwine manure to RNG (renewable natural gas) system Bowling Green State UniversityNew central chiller plant (CCP1) Bowling Green State UniversityInstallation of two central chillers and infrastructure upgrade Bowling Green State UniversityMechanical and ductwork replacement in the Moore Musical Center Bowling Green State UniversityTechnology building infrastructure renovation BP HuskyPiping spool fabrication for the 2022 turnaround BrightmarkDairy to Renewable Natural Gas (RNG) facilities BrightmarkPlastics to fuel plant Bryan City SchoolsHVAC system at the new middle/high school Campbell Soup CompanyReverse Osmosis (RO) blended water system CertainTeedMechanical equipment, piping, ductwork, and equipment supports for the asphalt processing plant project City of ToledoSnow plow racks – fabrication, assembly, installation City of ToledoBay View wastewater treatment plant pump station repairs City of ToledoCo-generation plant equipment installations Cleveland Cliffs Columbus1,500 SF laboratory building and a 12,000 SF maintenance building Cleveland CliffsHot briquetted iron facility furnace tower, heat recovery units, process piping, and equipment setting Collins Park1 MW solar array to power the water treatment plant DanaPerformed the engineering, procurement and installation for the control package to monitor the Dana tank farm Dart ContainerBuilding 4 renovations for the manufacturing of foam cups, containers, straws, dinnerware, cutlery, etc. EDLLFG treatment project at the Lorain County landfill EDLPower station expansion project at the Lorain County Landfill Fenner DunlopNew process equipment lines Ford MotorsMechanical V6 upgrades at the Lima Engine plant General MotorsInstallation of the automated battery storage system and final battery mainline for Factory Zero General MotorsDust Collector Installation Gerdau SteelFurnace replacement and rolling mill installation Hanson AggregatesLargest suppliers of crushed stone, sand, and gravel in the US Health Care ReitMechanical system upgrades including HVAC, piping, boiler work and all plumbing Honda Motor CompanyNew assembly plant electrical, HVAC, and equipment installation Interstate Chemical6,000 SF administration and maintenance building Interstate ChemicalNew methanol and sodium methylate facility IPSHistorical office renovations of the former Ford Club into our Headquarters Johns ManvilleEngineered, procure, and construct (EPC) the furnace Johns ManvilleProcess equipment, piping, and electrical feeds to operate the units for the new roofing product line Johns ManvillePipe insulation facility addition Johnson Controls24,000 SF chem-set expansion Kraft HeinzSitework and concrete improvements for a new entrance to the distribution center La-Z-BoyThe new 30,000 SF furniture gallery is under construction. Libbey GlassRelocated and reinstalled the BLT (Black Label Tableware) equipment line LindeProcess gas boiler repairs Messer GasPhase 2 Air Separation Unit (ASU) plant installation Miceli DairyPlant expansion and visitor center Midwest TerminalNew maintenance facility and pipeline upgrades North Star BluescopeNew pre-engineered building where fuzzy filter equipment was housed North Star BluescopeProject Aristotle North Star BluescopeInstallation of the underground and above ground piping for the new rolling steel mill Northview High SchoolHVAC improvements and new mechanical room with equipment NSG Pilkington Replacement of two bucket elevator casings 280’ tall and rebuild of two mixer units NSG Pilkington Furnace rebuild Penta Career CenterHVAC systems and fabrication & installation of the piping mains Phoenix Technologies 66,000 SF bottle-to-bottle facility POETPiping for the biorefining plant Pro-TecNew administration building as an addition onto the existing manufacturing facility Pro-TecCGL3 packaging line general trades, electrical, and equipment setting Ransom & Randolph24,000 SF warehouse addition Sunoco RefineryNaphtha simplification process Toledo First Seventh Day Church7,708 SF annex with a gymnasium & restrooms. 6,395 SF school addition with classrooms & community space. Toledo Public SchoolsInstallation of the mechanical and HVAC systems for the new high school University of MichiganMechanical work/HVAC systems for the north quad residence & academic complex University of ToledoStadium drive bridge utility relocation University of ToledoNew steam plant mechanical systems to feed UTMC University of ToledoElectrical for the new Orthopaedic wing at UTMC Vehtek SystemsMulti-phase expansion to the metal forming and stamping facility WAGA EnergyLandfill to Renewable Natural Gas (RNG)