Fabrication

facility

  • 100,000 SF FACILITY
  • JUST-IN-TIME PRODUCT DELIVERY
  • ASME STAMPS/CERTIFICATIONS:
    – U STAMP: UNFIRED PRESSURE VESSELS
    – A STAMP: BOILER ASSEMBLY
    – S STAMP: POWER BOILER, INCLUDING THE PP STAMP FOR POWERPIPING
    – R STAMP: BOILER AND PRESSURE VESSEL REPAIR AND ALTERATIONS
    – DOT OQ PIPELINE CERTIFICATION
  • ENGINEER/FABRICATE/ASSEMBLES KIDS, TANKS, VESSELS, AND ERECT SYSTEM MODULES
  • SECURE STORAGE OF EQUIPMENT
IPS

INDUSTRIES SERVED

  • MANUFACTURING: GLASS, INDUSTRIAL METALS AND AUTOMOTIVE
  • FOOD & BEVERAGE: FOOD/BEVERAGE, MANUFACTURING, BUILDING PRODUCTS
  • PETROCHEMICAL: REFINERIES AND CHEMICAL PROCESSING PLANTS
  • POWER & ENERGY: POWER PLANTS, ALTERNATIVE ENERGY AND ALTERNATIVE FUELS
  • INSTITUTIONAL: EDUCATION, GOVERNMENT, COMMERCIAL AND HEALTHCARE
  • FEDERAL FUELS: US DEPARTMENT OF DEFENSE, NASA, DOE

Safety a commitment to

continuous improvement

HSE PHILOSOPHY& CULTURE

  • BEHAVIOR-BASED SAFETY PROGRAM
  • DESIGNED TO IMPROVE SAFETY AWARENESS
  • 100% EXECUTIVE SUPPORT OF TOP-TO-BOTTOM SAFETY CULTURE
  • SAFETY COMMITTEE FOCUSED ON CONTINUOUS IMPROVEMENT, PROCEDURE REVIEWS, & PRE-PLANNING
  • PLAN > DO > CHECK > ADJUST
Year Total Hours Worked EMR
2015 410,333 0.72
2016 381,171 0.85
2017 435,942 0.80
2018 429,197 0.78

IPS

Safety INITIATIVES

  • IPS LEADERSHIP OSHA -30 CERTIFICATE
  • MOST & DOT DRUG TESTING PROGRAMS-PRE-EMPLOYMENT, RANDOM, AND INCIDENT
  • MONTHLY CORPORATE JOB SITE SAFETY AUDITS
  • SAFETY FLASHES-COMPANY DISTRIBUTION
  • SUBCONTRACTOR PRE-QUALIFICATION PROGRAM
  • PROJECT SITE SPECIFIC SAFETY PROGRAMS
  • PRE-PROJECT SAFETY PARTNERING MEETING-CUSTOMER, IPS & SUB PARTICIPATION
  • JOB SITE SAFETY BULLETIN BOARD
  • WEEKLY SAFETY TOOL BOX TALKS-SITE PERSONNEL PARTICIPATION
  • DAILY JOB SAFETY ANALYSIS(JSA) CARDS
IPS

CLIFFS IRON UNITS

toledo, Oh

  • MULTIPLE SELF PERFORM WORK PACKAGES
    – SITE UTILITY – NATURAL GAS SYSTEM
    – REFORMER & HEAT RECOVERY
    – MATERIAL HANDLING – FEEDSTOCK & FINISHED PRODUCTS
  • PROJECT COST – $26 MILLION
  • INSTALLATION OF UNDERGROUND SITE PROCESS NATURAL GAS SYSTEM -100# PRESSURE – 2” TO 24” SIZE
  • INSTALLATION OF THE REFORMER SYSTEM TO INCLUDE REFORMED GAS DUCT BRIDGE AND HEAT RECOVERY SYSTEM
  • INSTALLATION OF PROCESS ELECTRICAL AND CONTROL SYSTEM FOR THE RAW FEEDSTOCK HANDLING EQUIPMENT AND FINAL BRIQUETTE PRODUCT LOAD OUT EQUIPMENT
950 jobs completed
35 Years in business
100000SF Fabrication Facility
300 MONTHS EXample statistic
ASME full certification

CONTACT

IPS

CLIENT/COMPANY NAME’S IPS FACILITATOR:
EXAMPLE NAME
419-555-5555
SALES@IPSCONTRACTOR.COM

contact us online