Project Scope:

Premcor/Husky Energy selected IPS to serve as the General Contractor responsible for construction of the Cat Gas Hydro Treater at their Lima, Ohio facility.

IPS self-performed all piping, steel erection and electrical services including installation of equipment and modules, towers, exchangers, heaters, and structural work.

Challenges:

Since the project was designed concurrent with construction, IPS was able to work closely with the lead design firm to ensure that construction and design could proceed in a logical, timely, and cost effective manner. The project schedule was maintained through a cooperative approach at the project team level with an eye toward solving problems in the field prior to their occurrence. However, when problems were identified in the field they were immediately attacked and solved.

$38mil. Total Construction
N/A Project Cost
1100acres Facility Size
2006 Completion Date
18 Project Duration
bid build Delivery Method

Project Scope:
IPS and ANR Pipeline negotiated a Master Service Agreement for the maintenance and improvement of site facilities, boilers and piping at the ANR Defiance compressor station.
Specific projects include:
• Compressor and ancillary components installation
• Install piping
• Install electrical, controls and instrumentation

Challenges:
IPS provided 24/7 maintenance services to ANR ensure optimal operation of the compressor station. This relationship was formed over a several year period and IPS took on more and more maintenance responsibilities over time.

IPS
N/A Delivery Method
Year to Year Delivery Method
Maintenance Service Agreement Delivery Method
N/A Total Construction
N/A Project Cost
N/A Completion Date
Year to Year Project Duration
Maintenance Service Agreement Delivery Method