Project Scope:

Single engine expansion

Install owner-provided CAT 3520 landfill gas generator set into exisiting power plant, currently running 3 other CAT 3520’s.  Also install owner-provided exhaust structure and switchgear room.

Challenges:

Project site, already having three generators inside the building, was very space-restricted.  Also, cabling for switchgear building and incorporation into station electrical scheme was very challenging.

IPS
$750,000 Total Construction
$2,000,000 Project Cost
No expansion Facility Size
6/2017 Completion Date
5 Project Duration
Lump Sum Delivery Method

Project Scope:
IPS and ANR Pipeline negotiated a Master Service Agreement for the maintenance and improvement of site facilities, boilers and piping at the ANR Defiance compressor station.
Specific projects include:
• Compressor and ancillary components installation
• Install piping
• Install electrical, controls and instrumentation

Challenges:
IPS provided 24/7 maintenance services to ANR ensure optimal operation of the compressor station. This relationship was formed over a several year period and IPS took on more and more maintenance responsibilities over time.

IPS
N/A Delivery Method
Year to Year Delivery Method
Maintenance Service Agreement Delivery Method
N/A Total Construction
N/A Project Cost
N/A Completion Date
Year to Year Project Duration
Maintenance Service Agreement Delivery Method