Project Scope:

In 2017 Energy Developments began construction on a Landfill Gas to Energy (LFGTE) Power Station in Georgetown, Ohio, just east of Cincinnati.

The LFGTE facility has a generating capacity of 4.8 MW. Renewable power generated from this facility is sold to AMP OHIO via Duke Energy transmission lines.

IPS was selected by EDI to perform as the General Contractor/Construction Manager for the LFGTE Power Station project. The construction contract also included site improvements of approximately 1/3 acre. Within the site, a pre-engineered metal building was constructed to house the (3) CAT 3520 landfill gas powered generator sets, and electrical switchgear. The balance of the site is consumed by the transformer yard, HVAC units, engine radiators, engine exhaust structure, landfill gas conditioning/compression equipment, and office trailer. IPS selected local contractors for all civil, electrical, mechanical, equipment setting and general trades work.

$3.8mil. Total Construction
$3.8mil. Project Cost
20,000sqft. Facility Size
5/2017 Completion Date
21 MONTHS Project Duration
CM at Risk Delivery Method