Project Scope:
The Citgo Petroleum facility in Oregon, Ohio consists of a dock off-loading facility and pipeline running from the off-loading station to Citgo’s storage tanks. Over a period of two years, Citgo upgraded its dock facilities and its pipeline. IPS upgraded the 12 inch dock line, extended the pipeline in several areas and did major re-work of the pipe support systems.

Challenges:
The Citgo pipeline runs thru the BP refinery in Oregon Ohio. All the repairs to the pipeline were required to be made in conjunction with the BP operational permitting process. This includes daily permits for all hot work and enhanced safety protocol.

IPS
$1mil. Total Construction
N/A Project Cost
8/2013 Completion Date
18 Project Duration
design bid build Delivery Method

Project Scope:
IPS and ANR Pipeline negotiated a Master Service Agreement for the maintenance and improvement of site facilities, boilers and piping at the ANR Defiance compressor station.
Specific projects include:
• Compressor and ancillary components installation
• Install piping
• Install electrical, controls and instrumentation

Challenges:
IPS provided 24/7 maintenance services to ANR ensure optimal operation of the compressor station. This relationship was formed over a several year period and IPS took on more and more maintenance responsibilities over time.

IPS
N/A Delivery Method
Year to Year Delivery Method
Maintenance Service Agreement Delivery Method
N/A Total Construction
N/A Project Cost
N/A Completion Date
Year to Year Project Duration
Maintenance Service Agreement Delivery Method