Project Scope:

NSG Pilkington is a world leader in flat glass production. The Rossford Plant operates two float glass lines – fueled by an oxy-fueled furnace – to produce windshields, solar panels, and architectural glass. Earlier in 2016 NSG Pilkington decided that one of the furnaces had exceeded its useful life and would need replaced. IPS was the selected Batch House contractor for the project. The work began with demolition of the existing bucket elevators, weigh bins, feeders, chutes and hoppers.

Rebuilding the Batch House required extensive Millwright and electrical work. IPS performed complete replacement of the (2) two bucket elevator casings 280’-0” tall. Rebuilt (2) two mixer units. IPS also installed a new feeders, chutes and weigh hoppers. Repaired the cullet bins and extended them up to allow more product storage.

Challenges:
Demolition of the existing batch house while parts of the batch house remained in operation for use. Working extensive overtime to meet the schedule. Prior to beginning this work, the IPS Team met with the Pilkington Safety Manager to establish proper procedures for all work in order to be safe and avoid any interruptions during operation.

IPS
$40mil. Total Construction
$1.2mil. Project Cost
9/2016 Completion Date
4 MONTHS Project Duration
bid build Delivery Method