Project Scope:

When a fire destroyed Johns Manville’s Defiance, Ohio manufacturing facility, the firm rebounded with plans for a $100-million state-of-the-art pipe insulation plant

Johns Manville chose IPS to complete the installation of all process piping, utility piping, and instrumentation for 8 new production lines. Equipment installation included steel fabrication, erection, and process equipment installation.

Challenges:

The production line that was affected by the five produced was one of JM’s top selling products. With the construction on such an aggressive schedule, IPS worked closely with JM, engineers and the other contractors to offer time saving approaches to the project. The project was completed on time to meet JM’s production schedule.

$100mil. Total Construction
$11mil. Project Cost
600,000SF 100,000SF expansion Facility Size
2007 Completion Date
22 MONTHS Project Duration
N/A Delivery Method