Project Scope:

IPS has an ongoing relationship with Kraft Heinz working on mechanical, electrical, and general construction projects. Our team completed all the sitework & concrete for a new entrance to the distribution center, parking lot improvements, and new guard house/security area. As the sun came up over the Kraft-Heinz Distribution Center the IPS Civil group began to grind through the first day of a 1,030 CY total concrete pour (41,000 SF) to be completed in three consecutive days. This project was initiated in efforts to change the flow of traffic at the customers facility to create a safer work environment.

 

 

1,100,000mil. Project Cost
41,000SF Facility Size
bid build Delivery Method

Project Scope:

IPS was contracted to construct a 40,000 square foot addition for Amcor’s plastic blow molding operations. IPS was responsible for the installation of 10,000 feet of process piping (carbon, stainless steel, and PVC). Systems include: process chill water, high/low pressure (600 psi/125 psi) compressed air, process cooling water, process steam, process condensate, and close tolerance process climate controls.

The machinery portion of the contract included the installation of: (3) 750 horse power three stage air compressors, (1) 250 ton process chiller, (1) 1,000 ton cooling tower, (2) 3,500 CFM built up custom air handler, (2) Sidel SBO 20 Blow Molders, (3) palletizing lines, (3) depalletizing lines, 1,000 linear feet of airveyor, and many other material handling and conveyance systems.

Challenge:

Along with a very tight schedule, these process systems had to be installed while the building was still under construction.  IPS also had to overcome the language barrier while working side by side with technicians from France, and Italy.

Bid Build Delivery Method
N/A Total Construction
$4.5mil. Project Cost
299,000sf Facility Size
N/A Completion Date
6 Project Duration
Bid Build Delivery Method

Ready to get started?

Contact Us today