Project Scope:

IPS removed the Mix Tank Discharge pump valves and piping to salvage valves and instruments for relocation. IPS was responsible for all associated piping from the Final Use Tank to the Pre-Blend Mix Tank and the Homogenizer Supply Tank.

Challenges:

Although everything on this project ran smoothly, there were some manpower issues and scheduling matters that led to some challenges. IPS completed the project on time with little interruption to their production schedule and were on budget.

$10mil. Total Construction
$68,118.00 Project Cost
56Acres under roof Facility Size
5/2015 Completion Date
2 Project Duration
bid build Delivery Method

Project Scope:

IPS was contracted to construct a 40,000 square foot addition for Amcor’s plastic blow molding operations. IPS was responsible for the installation of 10,000 feet of process piping (carbon, stainless steel, and PVC). Systems include: process chill water, high/low pressure (600 psi/125 psi) compressed air, process cooling water, process steam, process condensate, and close tolerance process climate controls.

The machinery portion of the contract included the installation of: (3) 750 horse power three stage air compressors, (1) 250 ton process chiller, (1) 1,000 ton cooling tower, (2) 3,500 CFM built up custom air handler, (2) Sidel SBO 20 Blow Molders, (3) palletizing lines, (3) depalletizing lines, 1,000 linear feet of airveyor, and many other material handling and conveyance systems.

Challenge:

Along with a very tight schedule, these process systems had to be installed while the building was still under construction.  IPS also had to overcome the language barrier while working side by side with technicians from France, and Italy.

N/A Delivery Method
6 Delivery Method
Bid Build Delivery Method
N/A Total Construction
$4.5mil. Project Cost
299,000sf Facility Size
N/A Completion Date
6 Project Duration
Bid Build Delivery Method