Project Scope:

IPS was selected to set and install a 1300-ton chiller and a 1300-ton cooling tower at the Ford, Lima engine plant. The installation included 24’’ and 14’’ stainless condenser water pipe, 18’’ and 12’’ carbon steel chilled water pipe and various associated pumps. IPS worked for TMI as the installation contractor of a turn- key contract that was completed in the spring 2016.

Challenges:

The work was performed on a very tight schedule as an integral piece of a much larger project, the V-6 Upgrade Project.

$850,000 Total Construction
N/A Project Cost
700,000SF Facility Size
4/2016 Completion Date
4 Project Duration
bid build Delivery Method

Project Scope:

Autoneum is a globally-leading supplier of acoustic and thermal management materials for automobiles.  The firm develops and produces multifunctional and lightweight components and systems for noise and heat protection necessary for vehicle comfort.  In September 2011, Autoneum began new construction of a 106,500 SF manufacturing facility in Oregon, Ohio.

IPS was contracted to install the presses at the new facility, and to complete the infrastructure associated with the mechanical and electrical systems required for operation of the presses.  Equipment installed by IPS includes:  compressors, dryers, boilers, chillers, economizers, chemical treatment systems, controls, and power wiring.  IPS also installed steam condensate, compressed air, and chilled water piping; and potable, non-potable, and dye-release systems.

Challenges:

Through outstanding team work and time management, IPS was able to have all the process systems operational and functional within a six-week period in order for Autoneum to begin cycling presses for production.  Since completion of this new facility in Oregon, Ohio, Autoneum has now become the only plant in North America that develops and produces the one-of-a-kind lightweight component for vehicles.

2/2012 Delivery Method
4 Delivery Method
Bid build Delivery Method
$1.7mil. Total Construction
$8.0mil. Project Cost
106,500SF Facility Size
2/2012 Completion Date
4 Project Duration
Bid build Delivery Method