Project Scope:

The Fremont facility improved the sanitary conditions in the plant by installing new hand wash stations. IPS installed 17 hand wash stations at various access doors into the plant. These stations supply instantaneous hot and cold water of the hand wash locations. IPS self-performed the plumbing and electrical work during this installation. This project allowed the plant to enhance the sanitary conditions with in the process areas.

Challenge:

These hand wash stations were in fully operational areas of the plant. All work performed had to be coordinated with plant operation and engineering. IPS completed this project without disrupting plant production schedule.

IPS
$144,275 Total Construction
$200,000 Project Cost
1/2015 Completion Date
4 MONTHS Project Duration
bid build Delivery Method