Project Scope:

UTMC built a new orthopedic wing at the UTMC hospital. This wing had to be integrated into the existing medical office buildings on the UTMC Campus. IPS performed all the electrical work in the new orthopedic wing and completed all the electrical interconnects with the existing facilities. The work consisted of interior installations, office lighting, common area lighting, and the installation of transformer upgrades.

IPS served as the lead electrical contractor on the expansion of an Orthopaedic Outpatient Care Center in the existing Dowling Hall building at UTMC.

The facility remained open to patients and fully operational throughout construction.

Challenges:

The facility remained open to patients and fully operational throughout construction.

$5.8mil. Total Construction
$1.1mil. Project Cost
23,000SF Facility Size
2017 Completion Date
11 MONTHS Project Duration
bid build Delivery Method