Project Scope:

IPS was selected to be the general contracting partner for The University of Toledo on the $2M infrastructure upgrade project.  The concrete, mechanical, electrical and general contracting responsibilities coupled with IPS’ underground utility experience make the project a great fit for our capabilities.  The coordination of sitework, excavation, cast-in-place concrete, waterproofing, mechanical and electrical scopes will require an integrated execution and the high-visibility campus location will require well-controlled site control and landscape restoration efforts.

Challenges:

IPS self-performed the majority of work while coordinating subcontractors already familiar with campus work.  The schedule requires start and finish dates around the campus student calendar requiring a tight delivery timetable.

IPS
N/A Total Construction
$2mm Project Cost
600+ LF of underground Facility Size
8/2019 Completion Date
4-6 MONTHS Project Duration
lump-sum GC Delivery Method