Project Scope:

American Honda Motor Company, Inc. built a new assembly plant in Greensburg, Indiana in 2008. The plant operations include: stamping, welding, painting, plastic injection molding sub and final assembly, testing and quality assurance. An integral part of the process is an industrial waste treatment plant that holds, treats and recycles various liquid waste streams in the manufacturing process.

As the General Contractor, IPS was responsible for all facets of the project from excavating and pouring concrete to the architectural work such as; block, pre-insulated siding, roofing and painting. Included was fabrication and erection of the structural steel, furnish and install exterior batch tanks with mezzanine steel and mixers, furnish and install process equipment such as; settlers, filter press, chemical tanks, pumps and polymer systems. With this turn- key project IPS executed all of the electrical, HVAC, controls and equipment installation.

$800mil. Total Construction
$12mil. Project Cost
1.3m sf Facility Size
3/2008 Completion Date
9 MONTHS Project Duration
bid build Delivery Method

Ready to get started?

Contact Us today