Project Scope:

Getrag is one of the largest independent automotive transmission manufacturers worldwide. Getrag is built a new 600,000 square ft. production/assembly facility in Tipton, Indiana to service the needs of Chrysler. IPS was chosen to perform two major phases of the construction.  The first of the phases covered the complete 600,000 sq. ft. manufacturing facility, installed process mains, as well as the piping for the makeup air units, and symphonic drain systems. IPS is also responsible for the installation of all plumbing and insulation for the new office area. IPS completed the mechanical, electrical, controls, Insulation and sheet metal for this project.

IPS

Challenges:

The second phase, is construction of the powerhouse mechanical, electrical, sheet metal, insulation and controls for the entire facility. All of the equipment will be supplied by IPS. As with previous projects, IPS is on a very tight schedule on the Getrag project, timetabled for completion in only 3 months. IPS has been able to manage these tasks with great success, given their ability and experience to manage large projects.

$22mil. Total Construction
N/A Project Cost
600,000SF Facility Size
11/2008 Completion Date
6 MONTHS Project Duration
bid build Delivery Method

Ready to get started?

Contact Us today