Project Scope:

IPS was selected to set and install a 1300-ton chiller and a 1300-ton cooling tower at the Ford, Lima engine plant. The installation included 24’’ and 14’’ stainless condenser water pipe, 18’’ and 12’’ carbon steel chilled water pipe and various associated pumps. IPS worked for TMI as the installation contractor of a turn- key contract that was completed in the spring 2016.

Challenges:

The work was performed on a very tight schedule as an integral piece of a much larger project, the V-6 Upgrade Project.

$850,000 Total Construction
N/A Project Cost
700,000SF Facility Size
4/2016 Completion Date
4 MONTHS Project Duration
bid build Delivery Method