Project Scope:

IPS was selected to be the mechanical contractor for the Ford Lima engine plant V-6 Upgrade Project that was completed in spring 2016. The mechanical package consisted of HVAC and installation of process piping including cooling water, compressed air, natural gas and motor oil systems. As part of the HVAC scope, IPS was responsible for demolition of existing roof top air handling units (AHU) and setting and installing of three TMI roof top AHUs.

Challenges:

The new TMI rooftop AHU were set during a weekend plant shut down. Due to the size of the units and set back on the roof, the units were set by a helicopter lift. This required extensive planning between IPS, the lifting company (Erickson), and the operational and safety people at the plant.

$2,800,000 Total Construction
N/A Project Cost
700,000SF Facility Size
5/2016 Completion Date
8 MONTHS Project Duration
bid build Delivery Method