Project Scope:

Dana is a world leader in the supply of highly engineered drivetrain, sealing, and thermal management technologies that improve the efficiency and performance of vehicles with both conventional and alternative-energy powertrains.

In May 2016 plans were released that Dana was building a 300,000 sq. ft. facility in Toledo, Ohio. Dana plans to invest approximately $70 million and employ over 300 new employees by 2020. IPS was selected to coordinate with equipment manufactures to transport Dana owned equipment from their vendors to the new facility.

IPS unloaded and installed the specialized equipment for production of their new rear axle as well as provided material and labor to install the process production equipment. IPS also performed the engineering, procurement and installation for the control package to monitor the Dana tank farm.

IPS

Challenges:

IPS worked closely with Dana personnel to ensure smooth operations to provide that the equipment installation was done on a timely basis during the beginning phases and throughout the duration of the launch of the new facility.

$70Mil. Total Construction
$2Mil. Project Cost
300,000SF Facility Size
12/2017 Completion Date
6 MONTHS Project Duration
bid build Delivery Method